Replaced 80m of corroded gas pipe at a Woodford school using underground copper, delivered safely with no disruption.
We recently completed the replacement of an 80-meter gas supply run for a school in Woodford, addressing a severely corroded existing line. Due to site constraints, a surface-level reroute was not an option. Instead, we carefully utilised the original underground route.
New copper pipework was installed along this route, then painted to provide enhanced corrosion resistance and ensure long-term durability.
Working in a live school environment required a highly coordinated and safety-conscious approach. Key measures included:
Despite the logistical complexities and confined nature of the site, the project was delivered efficiently, with: